You are here: Products / Preparatory studies / Completed

Completed preparatory studies

The following preparatory studies have been finalised and final reports are available for download here.

The final reports either compile the results of all tasks or report on the tasks seperately. For the numeration of the tasks refer to the overview of tasks.

If you would like to get more details about the preparation of one of these studies, please visit the webpage of the consultant. The list of all the links is available on the links page, third column. Links

(Lot 1) Boilers and combiboilers

Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7

summary

To top

(Lot 2) Water heaters

Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7

summary

To top

(Lot 3) Computers and monitors

Task 1-8

To top

(Lot 4) Imaging equipment

Link to documents on preparatory webpage

To top

(Lot 5) Consumer electronics: TV

Link to documents on preparatory webpage

To top

(Lot 6) Standby and off-mode losses

Link to documents on preparatory webpage

To top

(Lot 7) External power supplies and battery chargers

Link to documents on preparatory webpage

To top

(Lot 8) Office lighting

Task 1-8

To top

(Lot 9) Street lighting

Task 1-8

To top

(Lot 10) Room air conditioning appliances

comfort fans Task 1-8

residential ventilation Task 1-8

air conditioning Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

To top

(Lot 11) Electric motors

electric motors Task 1-8

fans Task 1-8

circulators Task 1-8

pumps Task 1-8

To top

(Lot 12) Commercial refrigerators and freezers

Link to documents on preparatory webpage

To top

(Lot 13) Domestic refrigerators and freezers

Task 1-2 Task 3-5 Task 6-7 appendixes for Task 5

To top

(Lot 14) Domestic washing machines and dishwashers

Task 1-2, Task 3-5, Task 6-7, appendixes for Task 5

To top

(Lot 16) Laundry dryers

Task 1 - 8

To top

(Lot 17) Vacuum cleaner

Final document is available, but not for public.

For further information please contact DG TREN.

To top

(Lot 18) Complex set-top boxes

Link to documents on preparatory webpage

To top

(Lot 19) Domestic Lighting part I & II

Task 1-8; project report

To top

(No lot number) Simple set-top boxes

Task 1-8

To top